Short Span Bridging System-10 m
Context:
- The 7th Short Span Bridging System-10 m (SSBS-10 m) inducted into Indian Army.
SSBS-10 m
- It is designed and developed by Defence Research and Development Organisation (DRDO).
- It plays a crucial role of bridging the gaps up to 9.5 m as a single span providing a 4 m wide, fully decked roadway, ensuring faster movement of the troops.
- It involved the development of two prototypes of 5 m SSBS on Tatra 6x6 chassis and another two prototypes of 10 m SSBS on Tatra 8x8 re-engineered chassis.
- This bridging system is compatible with Sarvatra Bridging System, where last span requires covering gaps less than 9.5 m.
- The deployed bridge is of the load classification of MLC 70.
Significance of this development:
- The system will help in quick movement of troops and enhance the mobilization of resources.
- It will give a boost to the fast-growing Indian defence industrial ecosystem and help the industry to contribute towards ‘Atmanirbhar Bharat’.